草莓视频污污污下载_日韩三级片中文字幕_一二不卡视频欧美日韩_毛片网站免费在线观看_自拍乱伦三级欧美_超碰最新在线_性色av蜜臀av色欲av免费_喂成人吃奶一区二区三区_少妇的大黑逼毛茸茸呢_亚洲AV中文无码字幕色

Xiangyang Guanyinge Sewage Treatment Project
Release:2024/11/14 |View:26

010.jpg


Model: BOT


Total operation period: 25 years


Design scale: 200,000 tons/day


Project process: secondary biological treatment process + depth treatment


Xiangyang Thunip Hanshui Water Co., Ltd. was established on July 7, 2006, and is responsible for the construction and operation of the Guanyinge Wastewater Treatment Plant project in accordance with the “Xiangfan Xiangcheng Guanyinge Wastewater Treatment Plant BOT Project Concession Agreement”, which came into effect on July 28, 2006, with a concession period of 25 years, including the construction period.


The company is located in Guanyinge Village, Pang Road Office, Xiangcheng District, Xiangyang City, Xiangyang City, east of Tangcheng, north of Da Nang Shou Mountain, west of Xi Family Ancestral Temple, south of the Han River, covering an area of 14 hectares, the planning of the total scale of sewage treatment of 200,000 tons / day, of which the first phase of 100,000 tons / day, and a long term of 200,000 tons / day. The sewage treatment process is A2O secondary biological treatment + coagulation and filtration depth treatment process, sludge treatment process is thickening + dehydration, the tail water is disinfected and discharged into the Han River through the South Drainage Canal, and the sludge is transported out to the disposal center for centralized disposal.